Aerial of intersection

Learn More

At a Glance

General Scope:

  • Expand the Hampton Roads Bridge-Tunnel from Hampton to Norfolk
  • Provide 6 Lane Capacity along I-64 corridor from Settlers Landing Rd. in Hampton to I-564 in Norfolk

Project Costs:

  • 3.3 to 3.8 billion (2016 dollars)

Project Schedule:

  • Contract Award Projected in 2019
  • Project Completion Expected in 2024

Current Status:

  • Numerous studies and surveys are underway to refine the project scope:
    • Corridor Survey
    • Geotechnical Studies
    • Wetland Delineation
    • Benthic Survey
    • Wildlife Studies
    • Cultural Resources Survey
    • Navigational Study
    • Hazardous Material Investigation
    • Traffic Operations Modeling